SERICPIPE FITTINGS INDUSTRIES
QUALITY

Defined at enquiry.
Controlled through release.

Bring the quality requirements into the first conversation: material, dimensions, examination, traceability and final records.

PROJECT QUALITY REQUIREMENTS

Make the acceptance criteria clear.

The following topics can be specified in your enquiry. Applicable capability, testing arrangements and documentation are confirmed during review.

01

Material traceability

Define heat-number identification and the records required to link material to the finished component.

02

Dimensional inspection

Specify the governing standard, approved drawing and dimensional acceptance requirements.

03

PMI & chemical analysis

Include material-verification and chemical-analysis requirements where applicable.

04

Mechanical & hardness testing

Identify the tests, acceptance criteria and laboratory documentation required by your specification.

05

PT / DPT and UT / RT

State the applicable examination method, extent and acceptance criteria. Scope depends on product and specification.

06

Heat-treatment records

Request the treatment documentation and charts required for the material and manufacturing route.

07

Calibration control

Include project requirements for inspection equipment and calibration records.

08

Material certificates

State any EN 10204 3.1 MTC requirement for review and confirmation with your order specification.

09

Third-party inspection

Include the ITP, nominated inspector and required hold or witness points.

From incoming material
to final documentation.

Material identification → heat-number traceability → forming or forging → heat treatment → inspection and NDT → final documentation.

Request current certificates and approvals relevant to your project. No certification or end-user approval is implied by the product information on this site.

Enquire about certificates & approvals ↗
YOUR NEXT PROJECT

Start with your specification.

Product. Material. Size. Schedule or class. Quantity. Inspection. Delivery.

Build your RFQ ↗